EARTHWORKS

Earthworks are engineering works carried out to the actual construction works, this includes the design and calculations, which are based on soil mechanics. Earthworks are of great importance for road and traffic route construction, railway construction, water engineering, landfill and tunnel construction.

Professional earthworks require good preliminary construction design, a soil investigation and, depending on the complexity of the project, also a stability analysis. Typical earthworks include embankments, dams, ditches, excavation pits and backfill as well as suitable measures for improving the subsoil, such as soil replacement and soil improvement using suitable construction materials such as geosynthetics. Separating and filtering non-wovens as well as geogrids, woven fabrics, sealing membranes, drainage membranes and erosion control mats are widely used.

Project Gallery

2023
HAP SENG PLANTATIONS (RIVER ESTATE) SDN BHD

The Execution and Completion of Contract for The Proposed Biogas and Polishing Plant at Tomanggong Palm Oil Mill (TPOM)

2022
MAJUMAS PASIFIK SDN BHD

Earthworks for 1km Main Road Widening & Upgrading

2020
SAPI PLANTATIONS SDN BHD

Earthworks for Biogas Lagoon & Water Reservoir (B) at Sapi Palm Oil Mill.

2019
PPB OIL PALMS BERHAD

Proposed Loading Ramp Restoration Works at Sabahmas Mill.

2019
TECHVANO CONSTRUCTION & ENGINEERING SDN BHD

Proposed of Aerobic Reactor Pond Earthworks for Polishing Plant at Bukit Mas Palm Oil Mill.

2017
GREEN LAGOON TECHNOLOGY SDN BHD

Proposed 600kW Biogas Power Plant Earthwork at Leepang Palm Oil Mill, Lahad Datu.

2012
SABAH DEVELOPMENT AND BOARD PALM OIL MILL SDN BHD

The Construction, Completion and Guarantee of Earthworks (Mill Site and Water Reservoir) for Pandewan Oil Mill.

2023
HAP SENG PLANTATIONS (RIVER ESTATE) SDN BHD

The Execution and Completion of Contract for The Slope Rectification and Geotextile Installation Works at Aerobic Pond No. 2 at Bukitmas Palm Oil Mill (BPOM)

2022
MAJUMAS PASIFIK SDN BHD

Earthworks for 7km Main Road Widening & Upgrading

2020
PW BIOTECH ENGINEERING SDN BHD

Proposed Biogas Power Plant Earthworks at Sook Palm Oil Mill, Keningau, Sabah.

2019
SAPI PLANTATIONS SDN BHD

Proposed Earthworks for Biogas Plant Extension (100m x 88m) for Sapi Palm Oil Mill.

2018
HAP SENG PLANTATIONS (RIVER ESTATES) SDN BHD

The Execution and Completion of Contract for The Earthworks for Biogas and Polishing Plant at Bukit Mas Palm Oil Mill (BPOM), Lahad Datu.

2017
SB RESORTS SDN BHD

Earthworks for MTSB Project on Part 115349070 at Ulu Segama, District of Lahad Datu.

2012
SERIJAYA INDUSTRI SDN BHD

The Execution and Completion of Contract No.2 for Earthworks for the Proposed 60/90 MT FFB/HR Palm Oil Mill at Luasong, Tawau, Sabah.

2022
MAJUMAS PASIFIK SDN BHD

Earthworks for for Worker Housing and Staff Housing Site Preparation

2021
MAJUMAS PASIFIK SDN BHD

Earthworks for a New 45/60 TPH FFB Palm Oil Mill c/w Nine (9) Nos of Ponds.

2020
SAPI PLANTATIONS SDN BHD 

Earthworks for Water Reservoir (A) at Sapi Palm Oil Mill.

2019
GREEN LAGOON TECHNOLOGY SDN BHD

Proposed Biogas Capture Plant Earthworks at Mayvin Palm Oil Mill, Sandakan, Sabah.

2017
SAKTI SURIA SDN BHD

Proposed Biogas Pond Earthworks for IOI Unico Desa Palm Oil Mill.

2015
PPB OIL PALMS BERHAD

Earthworks for Scrubber Platform & Engine Room Platform & Housing Site Levelling at Terusan Palm Oil Mill.

2009
LAM SOON PLANTATIONS SDN BHD

Land irrigation system.